Project Description

PROJECT DESCRIPTION

Williams Architects / Aquatics and a local land planner assisted the Cary Park District with a Comprehensive Park Plan for Cary Grove Park. The goal of the plan was to determine what recreational / aquatic amenities could be integrated into the existing Park. As a result of the Study, the Cary Park District determined that a centrally located Aquatic Center would be the first project to be implemented. The Cary Grove Aquatic Park (Sunburst Bay) is currently in the Construction Phase and features an 8-lane, 25Y lap pool with attached deep water area containing diving boards and a drop slide. A separate zero-depth entry activity pool with water features and a current channel, along with separate water slides will provide plenty of fun for patrons of all ages. The Aquatic Facility is currently on track to open Summer 2022!

YEAR: Est. 2022

SIZE: TBD

SERVICES

  • Pre-Design
  • Master Plan / Feasibility Study
  • Basic A&E Design Services
  • Interiors
  • Construction Administration

PROJECT HIGHLIGHTS